For this update, I focused primarily on finishing up the chapel at the end of the castle. Obviously I haven't finished the wall height, as I am doing the floorplan first, apart from that landing.
This was time consuming, but easy once I got one side one, thanks to the symmetry.
After that, I decided to add a ceiling to the hall leading to it. The height was restricted to being this low due to the positioning of a nearby staircase.
Subscribe to:
Posts (Atom)
Minecraft Build Project: Castle Ravenlot - Part 6
For this update, I focused primarily on finishing up the chapel at the end of the castle. Obviously I haven't finished the wall heigh...
-
The following was originally posted to DeviantArt on December 27, 2016. It is a short story connecting my character from a Pathfinder game t...
-
For this update, I opted to start with the floor of the Grand Entry, followed by the Hall of Faith leading up to the Chapel. I'll get ...